{"id":5960,"date":"2026-09-07T07:30:02","date_gmt":"2026-09-07T07:30:02","guid":{"rendered":"https:\/\/drolin-box.com\/?p=5960"},"modified":"2026-09-07T07:33:45","modified_gmt":"2026-09-07T07:33:45","slug":"how-to-choose-mining-container-s19-s21-z15-pro","status":"publish","type":"post","link":"https:\/\/drolin-box.com\/kk\/how-to-choose-mining-container-s19-s21-z15-pro\/","title":{"rendered":"S19 S21 \u0436\u04d9\u043d\u0435 Z15 Pro \u04af\u0448\u0456\u043d \u043c\u0430\u0439\u043d\u0438\u043d\u0433 \u043a\u043e\u043d\u0442\u0435\u0439\u043d\u0435\u0440\u0456\u043d \u049b\u0430\u043b\u0430\u0439 \u0442\u0430\u04a3\u0434\u0430\u0443 \u043a\u0435\u0440\u0435\u043a"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"5960\" class=\"elementor elementor-5960\" data-elementor-post-type=\"post\">\n\t\t\t\t<div data-particle_enable=\"false\" data-particle-mobile-disabled=\"false\" class=\"elementor-element elementor-element-b65e3e6 e-flex e-con-boxed e-con e-parent\" data-id=\"b65e3e6\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;ekit_has_onepagescroll_dot&quot;:&quot;yes&quot;}\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-632ea06 elementor-widget elementor-widget-text-editor\" data-id=\"632ea06\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;ekit_we_effect_on&quot;:&quot;none&quot;}\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p data-pm-slice=\"1 1 []\">A container may have enough physical space for your miners and still fail the project.<\/p><p>The real limits usually appear later: the electrical system cannot support the full load, the PDU arrangement does not match the miner input, the exhaust fans cannot remove the heat, or different miner models create uneven airflow inside the container.<\/p><p>This is why choosing a mining container for S19, S21, or Z15 Pro miners should begin with the miner specification, not only with the container length.<\/p><p>The right selection must connect five factors:<\/p><ul data-spread=\"false\"><li><p>Miner model and operating mode<\/p><\/li><li><p>Single-machine power consumption<\/p><\/li><li><p>Required airflow and heat rejection<\/p><\/li><li><p>PDU, cable and transformer capacity<\/p><\/li><li><p>Available container positions and maintenance space<\/p><\/li><\/ul><p>The calculations below are planning references only. Final capacity must be confirmed according to the exact miner variant, firmware, operating mode, ambient temperature, altitude, PDU design and container configuration.<\/p><h2>Why Miner Model Matters More Than Container Size<\/h2><p>Search terms such as \u201c40ft mining container\u201d and \u201cmining container for S19\u201d often make buyers think that container capacity is mainly a space problem.<\/p><p>It is not.<\/p><p>A miner converts almost all of its electrical input into heat. A 3.5 kW ASIC miner creates approximately 3.5 kW of heat that must be distributed and exhausted continuously. If a container contains 270 machines, the IT heat load can approach 1 MW before counting fans, control systems, lighting, networking equipment and other auxiliary loads.<\/p><p>Two miners may have similar external dimensions but different:<\/p><ul data-spread=\"false\"><li><p>Input voltage<\/p><\/li><li><p>Maximum current<\/p><\/li><li><p>Power consumption<\/p><\/li><li><p>Fan speed and airflow<\/p><\/li><li><p>Heat output<\/p><\/li><li><p>Noise level<\/p><\/li><li><p>Operating temperature range<\/p><\/li><li><p>Service clearance requirements<\/p><\/li><\/ul><p>For example, a container that works well with standard S19 units may require a different power distribution design for S21 XP miners. A Z15 Pro is also air-cooled, but it uses the Equihash algorithm and has different power, size and input requirements.<\/p><h3>Reference Miner Specifications<\/h3><table><tbody><tr><th>\u041c\u0430\u0439\u043d\u0435\u0440 \u043c\u043e\u0434\u0435\u043b\u0456<\/th><th>Mining Algorithm<\/th><th>Reference Hashrate<\/th><th>Reference Power<\/th><th>\u0421\u0430\u043b\u049b\u044b\u043d\u0434\u0430\u0442\u0443 \u0442\u04af\u0440\u0456<\/th><th>Key Planning Point<\/th><\/tr><tr><td>Antminer S19 Pro 110T<\/td><td>SHA-256<\/td><td>110 TH\/s<\/td><td>3,250 W<\/td><td>Air cooling<\/td><td>Confirm the exact S19 variant before calculating capacity<\/td><\/tr><tr><td>Antminer S21<\/td><td>SHA-256<\/td><td>200 TH\/s<\/td><td>3,500 W<\/td><td>Air cooling<\/td><td>Higher power density than many S19 configurations<\/td><\/tr><tr><td>Antminer S21 Pro<\/td><td>SHA-256<\/td><td>234 TH\/s<\/td><td>3,510 W<\/td><td>Air cooling<\/td><td>Similar power to S21 but requires exact batch confirmation<\/td><\/tr><tr><td>Antminer S21 XP<\/td><td>SHA-256<\/td><td>270 TH\/s<\/td><td>3,645 W<\/td><td>Air cooling<\/td><td>Higher heat load and tighter electrical headroom<\/td><\/tr><tr><td>Antminer Z15 Pro<\/td><td>Equihash and ZEC<\/td><td>840 KSol\/s<\/td><td>2,780 W<\/td><td>Air cooling<\/td><td>Different algorithm, voltage range and physical dimensions<\/td><\/tr><\/tbody><\/table><p>These figures are model references, not universal values for every S19 or S21 product. S19 Hydro, S21 Hydro and S21 XP Hydro are liquid-cooled models. They should be matched with a liquid cooling container and CDU system rather than a standard air-cooled mining container.<\/p><p><strong>\u041a\u04d9\u0441\u0456\u0431\u0438 \u043a\u0435\u04a3\u0435\u0441:<\/strong> Always ask the buyer for the complete model name, such as \u201cS21 200T\u201d or \u201cS21 XP 270T\u201d. \u201cS19\u201d and \u201cS21\u201d alone are not precise enough for electrical design.<\/p><h2>S19 and S21 Power and Airflow Differences<\/h2><p>The difference between S19 and S21 miners may appear small when looking at one machine.<\/p><p>A reference S19 Pro configuration uses approximately 3.25 kW. A standard S21 configuration uses approximately 3.5 kW. The difference is only about 250 W per miner, but it becomes significant at container scale.<\/p><p>With 300 machines:<\/p><ul data-spread=\"false\"><li><p>300 S19 Pro miners create about 975 kW of IT load<\/p><\/li><li><p>300 S21 miners create about 1,050 kW of IT load<\/p><\/li><li><p>300 S21 XP miners create about 1,093.5 kW of IT load<\/p><\/li><\/ul><p>The S21 XP difference is especially important. Compared with a 3.25 kW S19 Pro reference, 270 S21 XP miners require about 106.65 kW more IT power.<\/p><p>That extra load affects:<\/p><ul data-spread=\"false\"><li><p>Main breaker selection<\/p><\/li><li><p>PDU quantity and circuit layout<\/p><\/li><li><p>Cable size<\/p><\/li><li><p>\u0422\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440 \u0441\u044b\u0439\u044b\u043c\u0434\u044b\u043b\u044b\u0493\u044b<\/p><\/li><li><p>Fan and exhaust capacity<\/p><\/li><li><p>Container operating margin<\/p><\/li><li><p>Heat rejection at high ambient temperatures<\/p><\/li><\/ul><p>A higher hashrate does not automatically mean better container utilization. The container must be able to remove the heat produced by the total electrical load.<\/p><h3>Airflow Planning<\/h3><p>For an air-cooled mining container, the basic heat-removal relationship can be expressed as:<\/p><pre><code class=\"language-text\">Heat Load = Air Density \u00d7 Specific Heat \u00d7 Airflow \u00d7 Temperature Rise<\/code><\/pre><p>A simplified planning formula is:<\/p><pre><code class=\"language-text\">Required Airflow \u2248 Heat Load \u00f7 1.2 \u00f7 1.005 \u00f7 Allowable Temperature Rise<\/code><\/pre><p>For a 1 MW IT load with a theoretical 10\u00b0C air temperature rise, the required airflow is approximately:<\/p><pre><code class=\"language-text\">1,000,000 \u00f7 1.2 \u00f7 1.005 \u00f7 10 \u2248 82.9 m\u00b3\/s<\/code><\/pre><p>This is approximately 175,000 CFM before considering:<\/p><ul data-spread=\"false\"><li><p>Filter pressure loss<\/p><\/li><li><p>Louvers<\/p><\/li><li><p>Water curtains<\/p><\/li><li><p>Container internal resistance<\/p><\/li><li><p>Fan efficiency<\/p><\/li><li><p>High-altitude derating<\/p><\/li><li><p>Dust accumulation<\/p><\/li><li><p>Uneven miner placement<\/p><\/li><\/ul><p>The result should not be used as a final fan selection. The supplier should match fan curves, static pressure and container airflow paths to the actual miner configuration.<\/p><h2>How to Estimate Miner Quantity Per Container<\/h2><p>A practical mining container capacity calculator should use four separate limits:<\/p><pre><code class=\"language-text\">Physical Limit = Available Miner Positions\n\nPower Limit = Available IT Power \u00f7 Maximum Miner Input Power\n\nAirflow Limit = Effective Container Airflow \u00f7 Required Airflow Per Miner\n\nPDU Limit = Available PDU Outlets and Circuit Capacity<\/code><\/pre><p>The final quantity is the lowest result:<\/p><pre><code class=\"language-text\">Final Miner Quantity =\nMinimum of Physical Limit, Power Limit, Airflow Limit and PDU Limit<\/code><\/pre><h3>Power-Only Planning Screen<\/h3><p>The following table is only a mathematical screening tool. It does not represent a final guaranteed container capacity because it excludes fans, controls, cable losses, reserve margin and physical layout restrictions.<\/p><table><tbody><tr><th>\u041c\u0430\u0439\u043d\u0435\u0440 \u043c\u043e\u0434\u0435\u043b\u0456<\/th><th>Power Per Miner<\/th><th>650 kW Power Screen<\/th><th>1,000 kW Power Screen<\/th><th>1,300 kW Power Screen<\/th><\/tr><tr><td>S19 Pro Reference<\/td><td>3.25 kW<\/td><td>200 units<\/td><td>307 units<\/td><td>400 units<\/td><\/tr><tr><td>S21<\/td><td>3.50 kW<\/td><td>185 \u0431\u0456\u0440\u043b\u0456\u043a<\/td><td>285 units<\/td><td>371 units<\/td><\/tr><tr><td>S21 XP<\/td><td>3.645 kW<\/td><td>178 units<\/td><td>274 units<\/td><td>356 units<\/td><\/tr><tr><td>Z15 Pro<\/td><td>2.78 kW<\/td><td>233 units<\/td><td>359 units<\/td><td>467 units<\/td><\/tr><\/tbody><\/table><p>The difference between a mathematical power screen and a real quotation is critical.<\/p><p>For example, a current public DroLinBox air-cooled product configuration lists a 40ft container with approximately 1,000 kW rated power, 336 S19 units and approximately 270 to 290 S21 or T21 units depending on configuration.<\/p><p>An earlier project reference configuration uses approximately 1,300 kW with a larger fan and power-distribution arrangement.<\/p><p>These figures should not be merged into one universal specification. A quotation should clearly state:<\/p><ul data-spread=\"false\"><li><p>Whether the rated power refers to IT load or total connected load<\/p><\/li><li><p>Whether auxiliary systems are included<\/p><\/li><li><p>Whether the miner quantity is based on rated power or maximum power<\/p><\/li><li><p>Which PDU configuration is being used<\/p><\/li><li><p>What operating reserve is retained<\/p><\/li><li><p>What ambient temperature and altitude are assumed<\/p><\/li><\/ul><p>Using the S21 reference value of 3.5 kW:<\/p><pre><code class=\"language-text\">270 \u00d7 3.5 kW = 945 kW IT Load\n945 kW \u00d7 1.05 PUE = 992.25 kW Facility Load<\/code><\/pre><p>This example shows why 270 S21 miners may already consume almost 1 MW at the facility level after auxiliary loads are considered.<\/p><p><strong>\u041a\u04d9\u0441\u0456\u0431\u0438 \u043a\u0435\u04a3\u0435\u0441:<\/strong> Never compare \u201c336 miners per container\u201d with \u201c1,000 kW capacity\u201d until you know whether both figures refer to the same miner model and the same definition of power.<\/p><h2>Can Z15 Pro Miners Run in an Air-Cooled Container?<\/h2><p>Yes, Z15 Pro miners are air-cooled and can be considered for an air-cooled mining container when the electrical and airflow systems are designed correctly.<\/p><p>The official Z15 Pro specifications list:<\/p><ul data-spread=\"false\"><li><p>Equihash algorithm<\/p><\/li><li><p>ZEC mining compatibility<\/p><\/li><li><p>Approximately 840 KSol\/s<\/p><\/li><li><p>Approximately 2,780 W power consumption<\/p><\/li><li><p>200 to 240 V AC input range<\/p><\/li><li><p>428 \u00d7 195 \u00d7 290 mm miner size<\/p><\/li><li><p>Operating temperature of approximately 0\u00b0C to 40\u00b0C<\/p><\/li><li><p>Maximum operating altitude of approximately 2,000 m<\/p><\/li><li><p>Approximately 75 dBA noise under the listed test condition<\/p><\/li><\/ul><p>The Z15 Pro is not a direct one-to-one replacement for an S21.<\/p><p>Its key differences include:<\/p><h3>Different Power Requirement<\/h3><p>At approximately 2.78 kW per unit, the Z15 Pro has lower power consumption than a 3.5 kW S21. This may improve the power-based quantity calculation.<\/p><p>However, lower power does not automatically mean that more units can be installed. The actual limit may still come from:<\/p><ul data-spread=\"false\"><li><p>Rack spacing<\/p><\/li><li><p>Airflow distribution<\/p><\/li><li><p>PDU outlet quantity<\/p><\/li><li><p>Input voltage<\/p><\/li><li><p>Network cabling<\/p><\/li><li><p>Maintenance access<\/p><\/li><li><p>Container control logic<\/p><\/li><\/ul><h3>Different Dimensions<\/h3><p>The Z15 Pro dimensions differ from the standard S21 reference dimensions. A rack arrangement designed around S21 machines may need to be adjusted to maintain:<\/p><ul data-spread=\"false\"><li><p>Front intake clearance<\/p><\/li><li><p>Rear exhaust clearance<\/p><\/li><li><p>Cable bending radius<\/p><\/li><li><p>Safe removal space<\/p><\/li><li><p>Consistent airflow through each row<\/p><\/li><\/ul><h3>Different Operating Profile<\/h3><p>Z15 Pro deployment is usually associated with ZEC and Equihash mining rather than SHA-256 Bitcoin mining. The equipment can have a different operating profile, fan response and maintenance schedule.<\/p><p>A Z15 Pro mining container should therefore be designed as a ZEC mining solution, not simply marketed as an S21 container with different machines installed.<\/p><h2>20ft vs 40ft Mining Container Selection<\/h2><p>The choice between a 20ft and 40ft air-cooled mining container should be based on deployment scale, available power and expansion plans.<\/p><h3>When a 20ft Container Makes Sense<\/h3><p>A 20ft mining container may be suitable for:<\/p><ul data-spread=\"false\"><li><p>Pilot projects<\/p><\/li><li><p>Smaller sites<\/p><\/li><li><p>One primary miner model<\/p><\/li><li><p>Projects with approximately 650 kW class power planning<\/p><\/li><li><p>Limited transportation or crane access<\/p><\/li><li><p>Phased deployment<\/p><\/li><li><p>Customers who want a smaller initial CAPEX<\/p><\/li><\/ul><p>The main advantage is modularity. A buyer can deploy one container, validate site performance and then add additional modules.<\/p><p>The limitation is that a 20ft container reaches its electrical and airflow limits faster. High-power miners such as S21 XP may significantly reduce the practical quantity.<\/p><h3>When a 40ft Container Makes Sense<\/h3><p>A 40ft mining container is usually more suitable for:<\/p><ul data-spread=\"false\"><li><p>1 MW-class deployment<\/p><\/li><li><p>3 MW to 5 MW mining farms<\/p><\/li><li><p>Larger quantities of the same miner model<\/p><\/li><li><p>Lower cost per installed kW<\/p><\/li><li><p>Centralized PDU and cable planning<\/p><\/li><li><p>Projects with future expansion requirements<\/p><\/li><\/ul><p>A 40ft container may provide better layout efficiency, but it also requires more attention to:<\/p><ul data-spread=\"false\"><li><p>\u0422\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440 \u0441\u044b\u0439\u044b\u043c\u0434\u044b\u043b\u044b\u0493\u044b<\/p><\/li><li><p>Crane access<\/p><\/li><li><p>Foundation loading<\/p><\/li><li><p>Emergency routes<\/p><\/li><li><p>Exhaust discharge<\/p><\/li><li><p>Fire separation<\/p><\/li><li><p>Maintenance access<\/p><\/li><li><p>Local transportation restrictions<\/p><\/li><\/ul><p>For a 3 MW to 5 MW site, buyers should first define the target IT load and operating reserve. The number of containers should then be calculated from the actual per-container IT allowance.<\/p><h2>PDU Cable Transformer and Fan Planning<\/h2><p>Miner compatibility is incomplete without infrastructure compatibility.<\/p><h3>PDU Planning<\/h3><p>Different miner models may use different input voltage ranges and circuit requirements.<\/p><p>For example:<\/p><ul data-spread=\"false\"><li><p>S21 standard documentation lists a 220 to 277 V AC input range<\/p><\/li><li><p>Z15 Pro documentation lists a 200 to 240 V AC input range<\/p><\/li><li><p>S21 XP input requirements must be confirmed from the exact product batch<\/p><\/li><\/ul><p>The PDU design should define:<\/p><ul data-spread=\"false\"><li><p>Number of outlets<\/p><\/li><li><p>Branch circuit rating<\/p><\/li><li><p>Breaker rating<\/p><\/li><li><p>\u0424\u10d0\u10d6\u0430\u043b\u044b\u049b \u0442\u0435\u04a3\u0433\u0435\u0440\u0456\u043c<\/p><\/li><li><p>Cable type<\/p><\/li><li><p>Connector type<\/p><\/li><li><p>\u0410\u0440\u0442\u044b\u049b\u0448\u044b\u043b\u044b\u049b<\/p><\/li><li><p>Monitoring method<\/p><\/li><li><p>Protection coordination<\/p><\/li><\/ul><p>A three-phase distribution system can reduce current at the main feeder level, but the PDU branch design still needs to match the miner power supplies.<\/p><h3>Cable and Transformer Planning<\/h3><p>A simple transformer planning formula is:<\/p><pre><code class=\"language-text\">Transformer Nameplate Capacity =\nFacility Load \u00f7 Power Factor \u00f7 Target Transformer Loading<\/code><\/pre><p>Illustrative example:<\/p><pre><code class=\"language-text\">270 S21 miners \u00d7 3.5 kW = 945 kW IT Load\n945 kW \u00d7 1.05 PUE = 992.25 kW Facility Load\n992.25 kW \u00f7 0.95 \u00f7 0.80 \u2248 1,305 kVA<\/code><\/pre><p>This does not mean every 270-S21 project requires a 1,305 kVA transformer. The final value depends on local electrical standards, transformer loading policy, power factor, auxiliary systems and expansion reserve.<\/p><p>The point is simple: a 1 MW mining container may require a transformer larger than 1 MVA once facility loads and design margins are included.<\/p><h3>Fan and Exhaust Planning<\/h3><p>Fan quantity should be selected according to:<\/p><ul data-spread=\"false\"><li><p>Total heat load<\/p><\/li><li><p>Allowable temperature rise<\/p><\/li><li><p>Static pressure<\/p><\/li><li><p>Filter condition<\/p><\/li><li><p>Outdoor temperature<\/p><\/li><li><p>Altitude<\/p><\/li><li><p>\u0416\u0435\u043b\u0434\u0435\u0442\u043a\u0438\u0448\u0442\u0456\u04a3 \u0440\u0435\u0437\u0435\u0440\u0432\u0442\u0456\u043a \u043a\u04e9\u0448\u0456\u0440\u043c\u0435\u0441\u0456<\/p><\/li><li><p>Maintenance strategy<\/p><\/li><\/ul><p>A container with enough fan quantity on paper may still underperform if the exhaust path is restricted or filters become blocked by dust.<\/p><p>For high-temperature or high-dust regions, buyers should request:<\/p><ul data-spread=\"false\"><li><p>Fan performance curves<\/p><\/li><li><p>Design ambient temperature<\/p><\/li><li><p>Filter pressure-drop data<\/p><\/li><li><p>Alarm thresholds<\/p><\/li><li><p>Fan failure strategy<\/p><\/li><li><p>Replacement procedure<\/p><\/li><li><p>High-temperature derating assumptions<\/p><\/li><\/ul><h2>Mixed Miner Deployment Risks<\/h2><p>Mixed deployment can improve flexibility, but it increases engineering complexity.<\/p><p>The most common risks include:<\/p><h3>Uneven Heat Distribution<\/h3><p>S21 XP miners generate more heat per unit than Z15 Pro miners. If both are placed in the same row without airflow balancing, some positions may operate at higher inlet temperatures.<\/p><h3>Different Electrical Requirements<\/h3><p>S21 and Z15 Pro miners may not use the same input voltage range or circuit arrangement. A shared PDU layout may create unused capacity or overload specific circuits.<\/p><h3>Different Fan Curves<\/h3><p>The miners may respond differently to changes in temperature. One model may increase fan speed earlier, changing the pressure balance for nearby machines.<\/p><h3>Maintenance Complexity<\/h3><p>Mixed fleets require different:<\/p><ul data-spread=\"false\"><li><p>\u0417\u0430\u043f\u0430\u0441 \u0431\u04e9\u043b\u0448\u0435\u043a\u0442\u0435\u0440<\/p><\/li><li><p>Firmware management<\/p><\/li><li><p>Fan replacement procedures<\/p><\/li><li><p>PSU replacement procedures<\/p><\/li><li><p>Monitoring rules<\/p><\/li><li><p>Operating temperature limits<\/p><\/li><\/ul><h3>Difficult Capacity Quotation<\/h3><p>A supplier cannot accurately confirm the quantity of mixed miners using only the total number of machines. The quotation should include a row-by-row layout, power schedule and PDU schedule.<\/p><p>For a mixed deployment, ask for:<\/p><ul data-spread=\"false\"><li><p>Miner position map<\/p><\/li><li><p>Total power by row<\/p><\/li><li><p>PDU allocation<\/p><\/li><li><p>Airflow direction<\/p><\/li><li><p>Temperature sensor locations<\/p><\/li><li><p>Maximum allowable inlet temperature<\/p><\/li><li><p>Recommended service clearance<\/p><\/li><\/ul><h2>What Buyers Should Send Before Requesting a Quote<\/h2><p>To evaluate an ASIC mining container correctly, buyers should prepare the following information:<\/p><ol start=\"1\" data-spread=\"false\"><li><p>Miner brand<\/p><\/li><li><p>Complete miner model<\/p><\/li><li><p>Rated power per miner<\/p><\/li><li><p>Maximum input power<\/p><\/li><li><p>\u041c\u0438\u043d\u0435\u0440 \u043c\u04e9\u043b\u0448\u0435\u0440\u0456<\/p><\/li><li><p>Target hashrate or mining algorithm<\/p><\/li><li><p>Project country and grid standard<\/p><\/li><li><p>Available voltage and frequency<\/p><\/li><li><p>Available transformer capacity<\/p><\/li><li><p>Expected ambient temperature<\/p><\/li><li><p>Site altitude<\/p><\/li><li><p>Dust, humidity and weather conditions<\/p><\/li><li><p>Preferred 20ft or 40ft container<\/p><\/li><li><p>Expansion target<\/p><\/li><li><p>Whether the miners are air-cooled or hydro-cooled<\/p><\/li><li><p>Site photos or a basic layout<\/p><\/li><li><p>Transportation and crane limitations<\/p><\/li><li><p>Required monitoring and remote-control functions<\/p><\/li><\/ol><p>A useful quotation request should not only say:<\/p><blockquote><p>\u201cPlease quote one 40ft mining container.\u201d<\/p><\/blockquote><p>It should say:<\/p><blockquote><p>\u201cPlease quote a 40ft air-cooled mining container for 180 S21 miners at 3.5 kW each, with a 1 MW-class electrical design, 400 V three-phase site power, a summer ambient temperature of 35\u00b0C, and expansion space for one additional container.\u201d<\/p><\/blockquote><p>That information allows the supplier to calculate a real solution instead of sending a generic product price.<\/p><h2>\u0416\u0438\u0456 \u049b\u043e\u0439\u044b\u043b\u0430\u0442\u044b\u043d \u0441\u04b1\u0440\u0430\u049b\u0442\u0430\u0440<\/h2><h3>Can an S19 mining container run S21 miners?<\/h3><p>Usually, the container concept can be adapted, but the electrical and airflow design must be checked again. S21 miners typically use more power than many S19 variants, so the original PDU and fan configuration may not be sufficient.<\/p><h3>Can a Z15 Pro run in a Bitcoin mining container?<\/h3><p>A Z15 Pro is an air-cooled ASIC miner and can run in an air-cooled mining container when the container is correctly configured. The PDU voltage, rack layout, airflow and monitoring settings must be confirmed.<\/p><h3>Can S19 Hydro or S21 Hydro run in an air-cooled container?<\/h3><p>No. Hydro models require liquid cooling connections and a compatible CDU or cooling loop. They should be planned as liquid-cooled mining equipment.<\/p><h3>Is the number of miner positions the same as the usable capacity?<\/h3><p>No. Physical positions are only one limit. Power, PDU, airflow, transformer capacity, service clearance and environmental conditions may reduce the final usable quantity.<\/p><h3>Is a 40ft container always better than a 20ft container?<\/h3><p>No. A 40ft unit is usually more efficient for larger projects, but a 20ft unit may be better for pilot deployment, limited site access or phased investment.<\/p><h2>Request a Compatibility and Capacity Review<\/h2><p>The safest way to choose a mining container for S19, S21 and Z15 Pro miners is to review the miner list and the site conditions together.<\/p><p>DroLin Box can review the project requirements and prepare an appropriate technical scope for an air-cooled mining container, including the container size, miner quantity, power distribution and cooling configuration.<\/p><p>For a project review, submit:<\/p><ul data-spread=\"false\"><li><p>Miner brand and exact model<\/p><\/li><li><p>Quantity<\/p><\/li><li><p>Rated and maximum power<\/p><\/li><li><p>Project country<\/p><\/li><li><p>Available voltage and transformer capacity<\/p><\/li><li><p>Ambient temperature and altitude<\/p><\/li><li><p>Preferred container size<\/p><\/li><li><p>Expansion target<\/p><\/li><\/ul><p>\u0421\u043e\u043d\u0434\u0430\u0439-\u0430\u049b \u0441\u0456\u0437 \u0442\u0435\u043a\u0441\u0435\u0440\u0435 \u0430\u043b\u0430\u0441\u044b\u0437 <a href=\"https:\/\/drolin-box.com\/en\/product\/air-cooling-mining-container\/\">\u0410\u0443\u0430 \u0441\u0430\u043b\u049b\u044b\u043d\u0434\u0430\u0442\u049b\u044b\u0448 \u0431\u0430\u0440 \u0442\u0430\u0443-\u043a\u0435\u043d \u043a\u043e\u043d\u0442\u0435\u0439\u043d\u0435\u0440\u0456<\/a>, use the <a href=\"https:\/\/drolin-box.com\/en\/mining-container-quote-checklist\/\">Mining Container Quote Checklist<\/a>, or submit the project through the <a href=\"https:\/\/drolin-box.com\/en\/contact\/\">Contact page<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>A container may have enough physical space for your miners and still fail the project. The real limits usually appear later: the electrical system cannot support the full load, the PDU arrangement does not match the miner input, the exhaust fans cannot remove the heat, or different miner models create uneven airflow inside the container. [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":5961,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[27,28],"tags":[272,273,269,268,270,271],"class_list":["post-5960","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","category-news","tag-asic-mining-container-compatibility","tag-mining-container-capacity-calculator","tag-mining-container-for-s19","tag-mining-container-for-s19-s21-and-z15-pro","tag-mining-container-for-s21","tag-z15-pro-mining-container"],"blocksy_meta":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v28.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Mining Container for S19 S21 and Z15 Pro<\/title>\n<meta name=\"description\" content=\"Compare S19 S21 and Z15 Pro power airflow PDU and capacity requirements to choose the right 20ft or 40ft air cooled mining container.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/drolin-box.com\/kk\/how-to-choose-mining-container-s19-s21-z15-pro\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Optimizing Global Crypto Infrastructure: Next-Gen Mining Containers by DroLin Box\" \/>\n<meta property=\"og:description\" content=\"Discover why leading mining operations choose DroLin Box for reliable, high-efficiency infrastructure. See our latest 20ft &amp; 40ft configurations for Bitcoin 2026.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/drolin-box.com\/kk\/how-to-choose-mining-container-s19-s21-z15-pro\/\" \/>\n<meta property=\"og:site_name\" content=\"DroLin Box - Crypto Mining Containers | Air-Cooled &amp; Liquid-Cooling Solutions PUE 1.06\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ndwndn.enwa\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-07T07:30:02+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-07T07:33:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/drolin-box.com\/wp-content\/uploads\/2026\/09\/how-to-choose-mining-container-s19-s21-z15-pro-banner-16x9-1-1024x576.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"576\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Tomato-CADRO\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Tomato-CADRO\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 \u043c\u0438\u043d\u0443\u0442\u044b\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/drolin-box.com\\\/how-to-choose-mining-container-s19-s21-z15-pro\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/drolin-box.com\\\/how-to-choose-mining-container-s19-s21-z15-pro\\\/\"},\"author\":{\"name\":\"Tomato-CADRO\",\"@id\":\"https:\\\/\\\/drolin-box.com\\\/#\\\/schema\\\/person\\\/f25a65b2b2f87eea36654b2da7badf99\"},\"headline\":\"How to Choose a Mining Container for S19 S21 and Z15 Pro\",\"datePublished\":\"2026-09-07T07:30:02+00:00\",\"dateModified\":\"2026-09-07T07:33:45+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/drolin-box.com\\\/how-to-choose-mining-container-s19-s21-z15-pro\\\/\"},\"wordCount\":2399,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/drolin-box.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/drolin-box.com\\\/how-to-choose-mining-container-s19-s21-z15-pro\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/drolin-box.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/how-to-choose-mining-container-s19-s21-z15-pro-banner-16x9-1.png\",\"keywords\":[\"ASIC mining container compatibility\",\"mining container capacity calculator\",\"mining container for S19\",\"mining container for S19 S21 and Z15 Pro\",\"mining container for S21\",\"Z15 Pro mining container\"],\"articleSection\":[\"Blog\",\"News\"],\"inLanguage\":\"ru-RU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/drolin-box.com\\\/how-to-choose-mining-container-s19-s21-z15-pro\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/drolin-box.com\\\/how-to-choose-mining-container-s19-s21-z15-pro\\\/\",\"url\":\"https:\\\/\\\/drolin-box.com\\\/how-to-choose-mining-container-s19-s21-z15-pro\\\/\",\"name\":\"Mining Container for S19 S21 and Z15 Pro\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/drolin-box.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/drolin-box.com\\\/how-to-choose-mining-container-s19-s21-z15-pro\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/drolin-box.com\\\/how-to-choose-mining-container-s19-s21-z15-pro\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/drolin-box.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/how-to-choose-mining-container-s19-s21-z15-pro-banner-16x9-1.png\",\"datePublished\":\"2026-09-07T07:30:02+00:00\",\"dateModified\":\"2026-09-07T07:33:45+00:00\",\"description\":\"Compare S19 S21 and Z15 Pro power airflow PDU and capacity requirements to choose the right 20ft or 40ft air cooled mining container.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/drolin-box.com\\\/how-to-choose-mining-container-s19-s21-z15-pro\\\/#breadcrumb\"},\"inLanguage\":\"ru-RU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/drolin-box.com\\\/how-to-choose-mining-container-s19-s21-z15-pro\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ru-RU\",\"@id\":\"https:\\\/\\\/drolin-box.com\\\/how-to-choose-mining-container-s19-s21-z15-pro\\\/#primaryimage\",\"url\":\"https:\\\/\\\/drolin-box.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/how-to-choose-mining-container-s19-s21-z15-pro-banner-16x9-1.png\",\"contentUrl\":\"https:\\\/\\\/drolin-box.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/how-to-choose-mining-container-s19-s21-z15-pro-banner-16x9-1.png\",\"width\":1672,\"height\":941,\"caption\":\"How to Choose a Mining Container for S19 S21 and Z15 Pro\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/drolin-box.com\\\/how-to-choose-mining-container-s19-s21-z15-pro\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/drolin-box.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to Choose a Mining Container for S19 S21 and Z15 Pro\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/drolin-box.com\\\/#website\",\"url\":\"https:\\\/\\\/drolin-box.com\\\/\",\"name\":\"DroLin Box - Crypto Mining Containers | Air-Cooled & Liquid-Cooling Solutions PUE 1.06\",\"description\":\"Enterprise-Grade Hydro &amp; Air Mining Containers \u2013 PUE 1.06, 336+ ASIC Capacity, Global CE\\\/UL\\\/CSA Certified for Sustainable Farms\",\"publisher\":{\"@id\":\"https:\\\/\\\/drolin-box.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/drolin-box.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ru-RU\"},{\"@type\":[\"Organization\",\"Place\"],\"@id\":\"https:\\\/\\\/drolin-box.com\\\/#organization\",\"name\":\"DroLin Box - Crypto Mining Containers | Air-Cooled & Liquid-Cooling Solutions PUE 1.06\",\"url\":\"https:\\\/\\\/drolin-box.com\\\/\",\"logo\":{\"@id\":\"https:\\\/\\\/drolin-box.com\\\/how-to-choose-mining-container-s19-s21-z15-pro\\\/#local-main-organization-logo\"},\"image\":{\"@id\":\"https:\\\/\\\/drolin-box.com\\\/how-to-choose-mining-container-s19-s21-z15-pro\\\/#local-main-organization-logo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/ndwndn.enwa\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/in\\\/--72464b3b8\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@DroLinBoxMining\"],\"telephone\":[],\"openingHoursSpecification\":[{\"@type\":\"OpeningHoursSpecification\",\"dayOfWeek\":[\"Monday\",\"Tuesday\",\"Wednesday\",\"Thursday\",\"Friday\",\"Saturday\",\"Sunday\"],\"opens\":\"09:00\",\"closes\":\"17:00\"}]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/drolin-box.com\\\/#\\\/schema\\\/person\\\/f25a65b2b2f87eea36654b2da7badf99\",\"name\":\"Tomato-CADRO\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ru-RU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/bfef211b72781ebcee617d8c270120fafbdd7163ee0a22e58305d68830fc4c75?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/bfef211b72781ebcee617d8c270120fafbdd7163ee0a22e58305d68830fc4c75?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/bfef211b72781ebcee617d8c270120fafbdd7163ee0a22e58305d68830fc4c75?s=96&d=mm&r=g\",\"caption\":\"Tomato-CADRO\"},\"url\":\"https:\\\/\\\/drolin-box.com\\\/kk\\\/author\\\/tomato-cadro\\\/\"},{\"@type\":\"ImageObject\",\"inLanguage\":\"ru-RU\",\"@id\":\"https:\\\/\\\/drolin-box.com\\\/how-to-choose-mining-container-s19-s21-z15-pro\\\/#local-main-organization-logo\",\"url\":\"https:\\\/\\\/drolin-box.com\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/drolinbox-logo-2.png\",\"contentUrl\":\"https:\\\/\\\/drolin-box.com\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/drolinbox-logo-2.png\",\"width\":190,\"height\":52,\"caption\":\"DroLin Box - Crypto Mining Containers | Air-Cooled & Liquid-Cooling Solutions PUE 1.06\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Mining Container for S19 S21 and Z15 Pro","description":"Compare S19 S21 and Z15 Pro power airflow PDU and capacity requirements to choose the right 20ft or 40ft air cooled mining container.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/drolin-box.com\/kk\/how-to-choose-mining-container-s19-s21-z15-pro\/","og_locale":"en_US","og_type":"article","og_title":"Optimizing Global Crypto Infrastructure: Next-Gen Mining Containers by DroLin Box","og_description":"Discover why leading mining operations choose DroLin Box for reliable, high-efficiency infrastructure. See our latest 20ft & 40ft configurations for Bitcoin 2026.","og_url":"https:\/\/drolin-box.com\/kk\/how-to-choose-mining-container-s19-s21-z15-pro\/","og_site_name":"DroLin Box - Crypto Mining Containers | Air-Cooled &amp; Liquid-Cooling Solutions PUE 1.06","article_publisher":"https:\/\/www.facebook.com\/ndwndn.enwa\/","article_published_time":"2026-09-07T07:30:02+00:00","article_modified_time":"2026-09-07T07:33:45+00:00","og_image":[{"width":1024,"height":576,"url":"https:\/\/drolin-box.com\/wp-content\/uploads\/2026\/09\/how-to-choose-mining-container-s19-s21-z15-pro-banner-16x9-1-1024x576.png","type":"image\/png"}],"author":"Tomato-CADRO","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Tomato-CADRO","Est. reading time":"11 \u043c\u0438\u043d\u0443\u0442\u044b"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/drolin-box.com\/how-to-choose-mining-container-s19-s21-z15-pro\/#article","isPartOf":{"@id":"https:\/\/drolin-box.com\/how-to-choose-mining-container-s19-s21-z15-pro\/"},"author":{"name":"Tomato-CADRO","@id":"https:\/\/drolin-box.com\/#\/schema\/person\/f25a65b2b2f87eea36654b2da7badf99"},"headline":"How to Choose a Mining Container for S19 S21 and Z15 Pro","datePublished":"2026-09-07T07:30:02+00:00","dateModified":"2026-09-07T07:33:45+00:00","mainEntityOfPage":{"@id":"https:\/\/drolin-box.com\/how-to-choose-mining-container-s19-s21-z15-pro\/"},"wordCount":2399,"commentCount":0,"publisher":{"@id":"https:\/\/drolin-box.com\/#organization"},"image":{"@id":"https:\/\/drolin-box.com\/how-to-choose-mining-container-s19-s21-z15-pro\/#primaryimage"},"thumbnailUrl":"https:\/\/drolin-box.com\/wp-content\/uploads\/2026\/09\/how-to-choose-mining-container-s19-s21-z15-pro-banner-16x9-1.png","keywords":["ASIC mining container compatibility","mining container capacity calculator","mining container for S19","mining container for S19 S21 and Z15 Pro","mining container for S21","Z15 Pro mining container"],"articleSection":["Blog","News"],"inLanguage":"ru-RU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/drolin-box.com\/how-to-choose-mining-container-s19-s21-z15-pro\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/drolin-box.com\/how-to-choose-mining-container-s19-s21-z15-pro\/","url":"https:\/\/drolin-box.com\/how-to-choose-mining-container-s19-s21-z15-pro\/","name":"Mining Container for S19 S21 and Z15 Pro","isPartOf":{"@id":"https:\/\/drolin-box.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/drolin-box.com\/how-to-choose-mining-container-s19-s21-z15-pro\/#primaryimage"},"image":{"@id":"https:\/\/drolin-box.com\/how-to-choose-mining-container-s19-s21-z15-pro\/#primaryimage"},"thumbnailUrl":"https:\/\/drolin-box.com\/wp-content\/uploads\/2026\/09\/how-to-choose-mining-container-s19-s21-z15-pro-banner-16x9-1.png","datePublished":"2026-09-07T07:30:02+00:00","dateModified":"2026-09-07T07:33:45+00:00","description":"Compare S19 S21 and Z15 Pro power airflow PDU and capacity requirements to choose the right 20ft or 40ft air cooled mining container.","breadcrumb":{"@id":"https:\/\/drolin-box.com\/how-to-choose-mining-container-s19-s21-z15-pro\/#breadcrumb"},"inLanguage":"ru-RU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/drolin-box.com\/how-to-choose-mining-container-s19-s21-z15-pro\/"]}]},{"@type":"ImageObject","inLanguage":"ru-RU","@id":"https:\/\/drolin-box.com\/how-to-choose-mining-container-s19-s21-z15-pro\/#primaryimage","url":"https:\/\/drolin-box.com\/wp-content\/uploads\/2026\/09\/how-to-choose-mining-container-s19-s21-z15-pro-banner-16x9-1.png","contentUrl":"https:\/\/drolin-box.com\/wp-content\/uploads\/2026\/09\/how-to-choose-mining-container-s19-s21-z15-pro-banner-16x9-1.png","width":1672,"height":941,"caption":"How to Choose a Mining Container for S19 S21 and Z15 Pro"},{"@type":"BreadcrumbList","@id":"https:\/\/drolin-box.com\/how-to-choose-mining-container-s19-s21-z15-pro\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/drolin-box.com\/"},{"@type":"ListItem","position":2,"name":"How to Choose a Mining Container for S19 S21 and Z15 Pro"}]},{"@type":"WebSite","@id":"https:\/\/drolin-box.com\/#website","url":"https:\/\/drolin-box.com\/","name":"DroLin Box - \u041a\u0440\u0438\u043f\u0442\u043e \u043c\u0430\u0439\u043d\u0438\u043d\u0433 \u043a\u043e\u043d\u0442\u0435\u0439\u043d\u0435\u0440\u043b\u0435\u0440\u0456 | \u0421\u044b\u0440\u0442\u049b\u044b \u0430\u0443\u0430\u043c\u0435\u043d \u0436\u04d9\u043d\u0435 \u0441\u04b1\u0439\u044b\u049b\u0442\u044b\u049b\u043f\u0435\u043d \u0441\u0430\u043b\u049b\u044b\u043d\u0434\u0430\u0442\u0443 \u0448\u0435\u0448\u0456\u043c\u0434\u0435\u0440\u0456 PUE 1.06","description":"\u041a\u04d9\u0441\u0456\u043f\u043e\u0440\u044b\u043d \u0434\u0435\u04a3\u0433\u0435\u0439\u0456\u043d\u0434\u0435\u0433\u0456 \u0441\u0443 \u0436\u04d9\u043d\u0435 \u0430\u0443\u0430\u043c\u0435\u043d \u049b\u0430\u0437\u0443 \u043a\u043e\u043d\u0442\u0435\u0439\u043d\u0435\u0440\u043b\u0435\u0440\u0456 \u2013 PUE 1.06, 336+ ASIC \u0441\u044b\u0439\u044b\u043c\u0434\u044b\u043b\u044b\u0493\u044b, \u0442\u04b1\u0440\u0430\u049b\u0442\u044b \u0444\u0435\u0440\u043c\u0430\u043b\u0430\u0440 \u04af\u0448\u0456\u043d \u04d9\u043b\u0435\u043c\u0434\u0456\u043a CE\/UL\/CSA \u0441\u0435\u0440\u0442\u0438\u0444\u0438\u043a\u0430\u0442\u044b","publisher":{"@id":"https:\/\/drolin-box.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/drolin-box.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ru-RU"},{"@type":["Organization","Place"],"@id":"https:\/\/drolin-box.com\/#organization","name":"DroLin Box - \u041a\u0440\u0438\u043f\u0442\u043e \u043c\u0430\u0439\u043d\u0438\u043d\u0433 \u043a\u043e\u043d\u0442\u0435\u0439\u043d\u0435\u0440\u043b\u0435\u0440\u0456 | \u0421\u044b\u0440\u0442\u049b\u044b \u0430\u0443\u0430\u043c\u0435\u043d \u0436\u04d9\u043d\u0435 \u0441\u04b1\u0439\u044b\u049b\u0442\u044b\u049b\u043f\u0435\u043d \u0441\u0430\u043b\u049b\u044b\u043d\u0434\u0430\u0442\u0443 \u0448\u0435\u0448\u0456\u043c\u0434\u0435\u0440\u0456 PUE 1.06","url":"https:\/\/drolin-box.com\/","logo":{"@id":"https:\/\/drolin-box.com\/how-to-choose-mining-container-s19-s21-z15-pro\/#local-main-organization-logo"},"image":{"@id":"https:\/\/drolin-box.com\/how-to-choose-mining-container-s19-s21-z15-pro\/#local-main-organization-logo"},"sameAs":["https:\/\/www.facebook.com\/ndwndn.enwa\/","https:\/\/www.linkedin.com\/in\/--72464b3b8\/","https:\/\/www.youtube.com\/@DroLinBoxMining"],"telephone":[],"openingHoursSpecification":[{"@type":"OpeningHoursSpecification","dayOfWeek":["Monday","Tuesday","Wednesday","Thursday","Friday","Saturday","Sunday"],"opens":"09:00","closes":"17:00"}]},{"@type":"Person","@id":"https:\/\/drolin-box.com\/#\/schema\/person\/f25a65b2b2f87eea36654b2da7badf99","name":"\u0422\u043e\u043c\u0430\u0442-\u041a\u0410\u0414\u0420\u041e","image":{"@type":"ImageObject","inLanguage":"ru-RU","@id":"https:\/\/secure.gravatar.com\/avatar\/bfef211b72781ebcee617d8c270120fafbdd7163ee0a22e58305d68830fc4c75?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/bfef211b72781ebcee617d8c270120fafbdd7163ee0a22e58305d68830fc4c75?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/bfef211b72781ebcee617d8c270120fafbdd7163ee0a22e58305d68830fc4c75?s=96&d=mm&r=g","caption":"Tomato-CADRO"},"url":"https:\/\/drolin-box.com\/kk\/author\/tomato-cadro\/"},{"@type":"ImageObject","inLanguage":"ru-RU","@id":"https:\/\/drolin-box.com\/how-to-choose-mining-container-s19-s21-z15-pro\/#local-main-organization-logo","url":"https:\/\/drolin-box.com\/wp-content\/uploads\/2026\/01\/drolinbox-logo-2.png","contentUrl":"https:\/\/drolin-box.com\/wp-content\/uploads\/2026\/01\/drolinbox-logo-2.png","width":190,"height":52,"caption":"DroLin Box - Crypto Mining Containers | Air-Cooled & Liquid-Cooling Solutions PUE 1.06"}]}},"_links":{"self":[{"href":"https:\/\/drolin-box.com\/kk\/wp-json\/wp\/v2\/posts\/5960","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/drolin-box.com\/kk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/drolin-box.com\/kk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/drolin-box.com\/kk\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/drolin-box.com\/kk\/wp-json\/wp\/v2\/comments?post=5960"}],"version-history":[{"count":4,"href":"https:\/\/drolin-box.com\/kk\/wp-json\/wp\/v2\/posts\/5960\/revisions"}],"predecessor-version":[{"id":5965,"href":"https:\/\/drolin-box.com\/kk\/wp-json\/wp\/v2\/posts\/5960\/revisions\/5965"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/drolin-box.com\/kk\/wp-json\/wp\/v2\/media\/5961"}],"wp:attachment":[{"href":"https:\/\/drolin-box.com\/kk\/wp-json\/wp\/v2\/media?parent=5960"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/drolin-box.com\/kk\/wp-json\/wp\/v2\/categories?post=5960"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/drolin-box.com\/kk\/wp-json\/wp\/v2\/tags?post=5960"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}